HAL9000v2.0
10 kW
After my last e-bike (grayborg) is done it is time to make a new one. Concept is the same, batteries in frame and full suspension but the frame is different this time. It is CrMo tubes and carbon. Also approach is new, draw all the details and then make the bike. This is the first that i made this way all other are "build first -draw later or never". Frame is made to accept 60 cillindrical LiFePO4 10Ah cels, Bms, kelly controller and charger. also 6 regular 9/12/15/18 Ah SLA will fit. Swingarm is designed to hold up to 12kw and 250Nm of torque. Complete frame with very strong swingarm joint and swingarm is little under 5kg. New is also detachable half-swingarm so you can change the tyre without taking off the wheel. The torque arms are integrated in dropouts and they are 10mm thick. The bike will have some thing like "docking station", basicly fixed stand with 72V15A charger. All other parts will be standard MTB parts except form must have min. 100 travel. Now some progress pics...
first frame sketches
jig sketch
jig cutted
assembling jig.
The jig is made this way because I found piece of steel 15x200x2000mm in my workshop.
Tubes that I wanted is impossible to find neraby so I waited them 3 weeks and they came from Ukraine. Quite cheap...
Then tubes are cut and hydroformed...
All parts came mixed...
After 30 minutes of sorting and counting...
everything is ready for welding...
Dropouts with torque arms
Swingarm joint with cranck axle
52 pcs. puzzle (the box say 3-5 years but I plan to do it in a month... )
down batt holder with logo...
Working...
Also the logo is changed...
To be continued...
first frame sketches
jig sketch
jig cutted
assembling jig.
The jig is made this way because I found piece of steel 15x200x2000mm in my workshop.
Tubes that I wanted is impossible to find neraby so I waited them 3 weeks and they came from Ukraine. Quite cheap...
Then tubes are cut and hydroformed...
All parts came mixed...
After 30 minutes of sorting and counting...
everything is ready for welding...
Dropouts with torque arms
Swingarm joint with cranck axle
52 pcs. puzzle (the box say 3-5 years but I plan to do it in a month... )
down batt holder with logo...
Working...
Also the logo is changed...
To be continued...