We had one more nice day in the 50s F (that would be in the 10s for you metric types), then the temps dropped along with the snow. Now it's really cold in the garage to be building.
I added the chain, derailleur and back brake, then decided that I needed to remove the back wheel again, which is a pain. It would be so much easier if the bike would stand on its own. Time to build the bike stand. Here it's shown with the bike stand legs in the down position. I still need to cut the slots and tap the pivot tube to make it stay in one place.

I need to take off the wheel to add some braze-ons for the derailleur cable. Once that is in place the bike would be rideable, if I really wanted to take it outside in the snow and cold.
Also I'm trying to decide whether to stack the Ping split pack battery, or to have them one behind the other. I have some nice smoked Lexan to use for a battery box. I'll use the heat and bend method to form it.
-Warren.