











A_Boring_Username wrote:I recently got myself an ASEAKO central drive ebike (i believe it's a Tonaro bighit).

adrian_sm wrote:From the schematic, I think this is the mob that make them. Well they are the ones that bothered to put them through the EN15194 test regime.
http://www.caticgz.com/FirstItem.php?fdSortid=AAAO



okmate wrote:Hi guys i have a project in wait and looking forward to connecting it all up i will have a 48v battery pack but would like the battery wired up so that i can use my existing 24v charger can anyone suggest a schematic for me thanks guys

boo wrote:okmate wrote:Hi guys i have a project in wait and looking forward to connecting it all up i will have a 48v battery pack but would like the battery wired up so that i can use my existing 24v charger can anyone suggest a schematic for me thanks guys
i assume you use 4 X12V battery. Connect them series to form 48V pack. you can consider this configuration. Fuses are for protection in case the switch got stuck.





acid wrote:I build a 100V/100A switch with a precharger:
The FETs are IRFB4110 from an old controller, 3 in parallel and the forth one to precharge the controller over a 100 ohm resistor.
edit:
This is the final result. It charges the controller with 1A for half a second. That should be enough time to connect the battery.
For 48V I would replace the 4.7u capacitor with 2.2u.
The z-diodes protect the FETs from blowing and the voltage range is 29-100V now.




billyjones454 wrote:Looking for a schematic for a thermometer with alarm.

Users browsing this forum: Merlin and 7 guests