Thanks for the correction Thudster i forgot the exact details but knew that the original
side plates you made for the box had to be redone...always these lil things that come along to test us
unfortunately when i do anything these 'lil things' ALWAYS turn up hahaa...
So i finished the surf ski over the weekend turned out really well looks alot like a GIANT banana hahaa
either way my mate is very happy with the job, took me best part of two days to sand the bloody thing and thats WITH an orbital sander
all good, mate Mick is a top fella always doing me favors, I didn't hesitate to offer to do the surf ski when he asked if i would give him a hand.
No payment for the work, hes a mate i dont charge mates for my labor but next time i break down i'll be calling Mick
as he has a big van LoL...
So with my workshop back i went out and continued fab on the 2 speed cruiser frame...in particular the aluminum
plates that will hold the electronics...
GOT Lipo? Got room for 22 packs within your frame? I HAVE
Firstly though the front gusset needed trimming to remove some weight, i am ever wary of that 75lb weight limit
After the front gusset was added i simply laid the frame upon the 3mm aluminum plate and marked
out the aluminum that will be the mounting plate to hold lipo packs/electronic speed controller etc...
Same procedure for the lower aluminum mounting plate...
The top aluminum sheet I can go ahead and mount, i will use steel tabs welded to the frames tubing to secure
the ali plate to the frame. The lower sheet i will obviously need to cut out sections to allow for the 2 speed Thudster Box
bottom bracket and stabilizer /actuator setup. I did a quick sketch onto the plates to see how we are looking for room hehehe
keep in mind, the lipo 'rectangles' inked on the aluminum represent
TWO LIPO PACKS as i will be using 2 packs side by side
i used an old 22v pack as a template to draw these so they are lil larger than pack size
Jealous much
Hyena? thats room for
TWENTY TWO PACKS within the frames triangle my dress wearing lippy applying, frock mounting friend
Just having a bite to eat and heading back out, hopefully have the top aluminum plate mounted by days end...
Once i have all the tabs welded to the frame i will be moving to the construction of the carbon fiber/fiberglass
tank and lower battery enclosure...
Back soon
KiM
p.s Just about to hit enterz and the Courier rocks in with my BRAND NEW v2 hv160!! $135 bucks THANKYOU Castle!
Thudster has also informed me today the drive is in the tank being anodized,
the man is hoping to get
both motor and 2 speed away sometime this week...work and family commitments allowing...