Rims arrived early. Tires arrive Monday. I can't wait to ride it but its still very cold here in Philly. At least I will be ready to ride first nice day of riding season
Hard to find, 135mm axle width, 36hole front hub with billet disc rotor mount. Bolt on of course. These were out of stock for a long time and I am excited to have it.
I wish I coukd afford triple crown forks but at least my suspension forks are air adjustable and have tbs "lock out" feature as...
Forks, handlebars, motor and rear rim arrived. Just set in place. Front wheel and tires will arrive after the weekend.
I'm worried about the crank arm length. Ill know after the tires are on so I can measure.
Oh SNAP!! Just got the best news ever. My friend just bought my Diamondback and.... I found a complete wheelset 90/90-18 wheels, 2.15-18 rims, spokes, front hub and QS V3 motor for $785. I still have to get them laced up but I can't believe this happened so fast. I thought I was going to have to...
Thank you efMX. I am shopping right now and I do like to know all my options. The rear axle space is 165mm wide. I don't mind using spacers.
So far it looks like I'm going with the 90/90-18 Duro tire for the rear on a 2.15-18 moto rim. I really have to save up for a good motor (unless my DB...
The name of the frame is under the pic. It is a 2018 PUMA frame Hand made by Le-Bui.
My first Ebike is a DiamondBack Overdrive which I'm selling to my friend because he is going to lose his drivers license soon.
The frame is set up for either 24x3" tires or 90/90-18" motor wheels. I will have enough money when I get my tax return check.
Is there any difference between knobby tires or street tires?
Thank you for the FaceBook link. I use SnapChat so I really don't have time for FB.
I did buy it from Mike Moser. I can't decide though if I want the MXUS or QS motor. My friend wants to give me his Crystalyte motor.
Also I'm thinking of a Sinewave controller with a display.
I'd like suggestions on which Ebike parts to use. This is my first full suspension build and I'd like to buy parts that fit (first time around to speed up completion).