liared
100 mW
I will order a Lifepo4 36 20 AH from a vendor from China (sun-thing). I have read that air freight of batteries is not working good from China these days so I will choose sea transport which will take 7-8 weeks or more to Europe.
I have read that the BMS should be disconnected if recharging can´t be done within a month.
I figure that the contact(s) on the BMS for the sense wires shall be disconnedted. Shall also one thick wire connecting the BMS to the battery be cut off (will be reconnected again when battery arrives and can be recharged).
Will this stop the BMS draining the battery (2 actions) or would one of the actions be enough?
(moderator edit: moved this to your new thread out of someone else's unrelated thread. Please do not use other people's unrelated threads for your questions, and please do not post multiple times for the same question. Be patient and wait for people to answer you.)
I have read that the BMS should be disconnected if recharging can´t be done within a month.
I figure that the contact(s) on the BMS for the sense wires shall be disconnedted. Shall also one thick wire connecting the BMS to the battery be cut off (will be reconnected again when battery arrives and can be recharged).
Will this stop the BMS draining the battery (2 actions) or would one of the actions be enough?
(moderator edit: moved this to your new thread out of someone else's unrelated thread. Please do not use other people's unrelated threads for your questions, and please do not post multiple times for the same question. Be patient and wait for people to answer you.)