donob08
100 W
Title includes a misnomer, misspelling or.. I'm thinking of making tribrid system out of my 2008 eZip Hybrid Trailz.
I commute to my weekly tasks by eZip. One day of the week my task is 20+ miles away. I have two 24V, 10AH battery packs on my eZip so 20 miles in the morning is no biggie. But some times they don't have enough stuff to keep me busy 8 hours, although my pay rate is 0.00/hr that can't afford to keep me. I get disruptive when I'm bored.
So, I'm thinking a bigbore model airplane engine, fossilish fuel, a generator head/alternator/dynamo to make cursing electrons, a dc to dc converter/charger to make 24V+ DC to charge my battery, on the go, as I go home. Four hours charge time "at the office" doesn't get it. All this stuff would ideally weigh about 16 lbs, the weight of the second battery I would leave home.
I'm an Electrical Engineer by education, but the last time I worked on "Electrical Machine Systems" was about 1962. Tell me there is better stuff now. All ideas will be appreciated.
I commute to my weekly tasks by eZip. One day of the week my task is 20+ miles away. I have two 24V, 10AH battery packs on my eZip so 20 miles in the morning is no biggie. But some times they don't have enough stuff to keep me busy 8 hours, although my pay rate is 0.00/hr that can't afford to keep me. I get disruptive when I'm bored.
So, I'm thinking a bigbore model airplane engine, fossilish fuel, a generator head/alternator/dynamo to make cursing electrons, a dc to dc converter/charger to make 24V+ DC to charge my battery, on the go, as I go home. Four hours charge time "at the office" doesn't get it. All this stuff would ideally weigh about 16 lbs, the weight of the second battery I would leave home.
I'm an Electrical Engineer by education, but the last time I worked on "Electrical Machine Systems" was about 1962. Tell me there is better stuff now. All ideas will be appreciated.