Hey,
I was just wondering. I'm planning on using 2/0 AWG (70mm2) wire for my electric system to carrying 100A continious and 300A for 30 seconds and I'm planning on using a 400A fuse.
I just want to make sure the wire won't melt before causing the fuse to blow. Is 2/0 AWG adequete for this job?
I was just wondering. I'm planning on using 2/0 AWG (70mm2) wire for my electric system to carrying 100A continious and 300A for 30 seconds and I'm planning on using a 400A fuse.
I just want to make sure the wire won't melt before causing the fuse to blow. Is 2/0 AWG adequete for this job?