randyc1 said:How much thread was left on hangers with 6mm spacers?
Those motor mounts are the best i have seen here!, would sell very well ?
Are you going to try the VESC's
okp said:Hey!
This one is for you :
![]()
randyc1 said:Can i ask Squad how you were able to get the the (Motor Mount + 15mm Pulley) to fit on Motor Shaft ?
How thick is the Motor Mount where motor is attached ?, ... how many mm where left for Pulley ??
...I Want to use a 15mm belt on a single motor skateboard, but i heard Sk3 6364 shaft is only 27mm long
Thanks!
Squad said:randyc1 said:Can i ask Squad how you were able to get the the (Motor Mount + 15mm Pulley) to fit on Motor Shaft ?
How thick is the Motor Mount where motor is attached ?, ... how many mm where left for Pulley ??
...I Want to use a 15mm belt on a single motor skateboard, but i heard Sk3 6364 shaft is only 27mm long
Thanks!
okp said:great! which motor brand is this ? never seen it
you almost got everything ?
randyc1 said:Hey squad!
Can you please tell me where you got your motor Gear?. I see it is hubless ,where are the set srews ?...under belt section ?
Motor shaft on Turnigy 6364 is only 27mm long ánd to fit a 15mm wide gear I need a hubless motor gear like yours .
Thank you !
randyc1 said:Thanks Squad I really appreciate !!
So you machined the Hub off , then you just drilled & threaded straight through the the pulley to put 2 m4 set screws,... 1 on each side?
Squad said:randyc1 said:Thanks Squad I really appreciate !!
So you machined the Hub off , then you just drilled & threaded straight through the the pulley to put 2 m4 set screws,... 1 on each side?
First I bored pulley to 8mm to fit nicely on the shaft, then machined keyway (motor shaft has also milled keyway), and drilled, tapped for one m4 set-screw (on the opposite side of keyway, motor shaft has also milled flat spot)
randyc1 said:Since i have no keyway , I think i will dremel 2 flat spots (1on each side),..drill straight through pulley, tap m4 and put 1 set screw on each side.
Squad said:randyc1 said:Since i have no keyway , I think i will dremel 2 flat spots (1on each side),..drill straight through pulley, tap m4 and put 1 set screw on each side.
I think that should do the trick, a lot of people on ES use only set screw + flat spot on shaft to mount pulley.
loganrhyne said:Could you post a bit of detail about the plug-in ports (sorry one of the things I don't know is what they're actually called!) that you used for the power and balance cables and how you wired them up? I haven't seen anybody else with such a clean look on their charging setup.
Lots of inspiration in your build for upping the quality of finish; thanks!
kenf4345 said:I like the idea of onboard charging. I'm planning on running a 6S set up with total of 4 x 3S 5000mAh packs (2in series x 2 and then running the packs in parallel. Hard to explain. The result is 10000Mah and 6S voltage. ) My questions is, if i want to have on board charging and all the battery packs spliced into a parallel charging and balancing board, will the fact that half the packs are in series mess this idea up. Squad how did you wire yours?