speedmd
10 MW
2.9 million tons has the BSometer going off quite loudly. I see these claims bouncing around the web a bit. Could be as there are mills going back a few years. :lol:
Your point taken, it could certainly become a large issue if nothing done to design in some recyclability. Carbon rivers claims they can do it with a net positive energy. https://www.energy.gov/eere/wind/articles/carbon-rivers-makes-wind-turbine-blade-recycling-and-upcycling-reality-support May prove out.
There may be much better uses for the Ground up Glass composites. They mix in well (unburnt) going directly into cement. Resin bits and all. A point or even less of bonding agent added sticks most everything if higher strength is desired. Most of the concrete suppliers near here are always looking for additional aggregate and would certainly use up most anything like this they could find on many of the jobs that are not requiring gov type certs.

Your point taken, it could certainly become a large issue if nothing done to design in some recyclability. Carbon rivers claims they can do it with a net positive energy. https://www.energy.gov/eere/wind/articles/carbon-rivers-makes-wind-turbine-blade-recycling-and-upcycling-reality-support May prove out.
There may be much better uses for the Ground up Glass composites. They mix in well (unburnt) going directly into cement. Resin bits and all. A point or even less of bonding agent added sticks most everything if higher strength is desired. Most of the concrete suppliers near here are always looking for additional aggregate and would certainly use up most anything like this they could find on many of the jobs that are not requiring gov type certs.