stiffi
100 W
Would somebody be able to offer advice to a total noob?
I have a Go-Hub front hub (Crystalyte 408). Motor is 500 watt and my controller is 20 AMP. I've been running it at 48V with SLA.
I was hoping to build a pack from the Fatpacks, but I wanted to know how many I would need.
Also, how hard is it to create a parallel pack without removing all the cells. Are the all the wires needed, already inside the casings? Or do I need to have other wire availalable. Can this be done by a relative noob? I've crimped on connectors and dones some light soldering, but I'm very new to this hobby!
Thanks, in advance for your help.
I have a Go-Hub front hub (Crystalyte 408). Motor is 500 watt and my controller is 20 AMP. I've been running it at 48V with SLA.
I was hoping to build a pack from the Fatpacks, but I wanted to know how many I would need.
Also, how hard is it to create a parallel pack without removing all the cells. Are the all the wires needed, already inside the casings? Or do I need to have other wire availalable. Can this be done by a relative noob? I've crimped on connectors and dones some light soldering, but I'm very new to this hobby!
Thanks, in advance for your help.