Kepler
10 MW
Got a bit more done on the new bike this morning. Test fitted the drive to check clearances and started setting up head stem heights to suit my size and reach. Chainline is perfect with the 48 tooth clearing nicely and lining up with the middle gear on the cluster. Plenty of ground clearance on the drive with it tucked up nice and high.
I will be doing some changes to drive control also on this build. Plan to get rid of the thumb throttle and replace it with a push button that just gives a full throttle boost. Also will be using one of the brake switches and retrofit it so that it activates on up changes through the dead band of the rapid fire shifter. Still need to work out how to do this though :lol:
I will be doing some changes to drive control also on this build. Plan to get rid of the thumb throttle and replace it with a push button that just gives a full throttle boost. Also will be using one of the brake switches and retrofit it so that it activates on up changes through the dead band of the rapid fire shifter. Still need to work out how to do this though :lol: