Farfle
100 kW
Mmk, started winding today, ended up doing 4 paralelled strands wound two turns in wye for a rpm/v of 11.2 right inbetween a 5304, and a 5303, it should do about 60 mph at 100v. It takes about 20 minutes per tooth right now, sooo, assuming I can get it down to 15 minutes, that's uhhh 16 hours straight winding. I might cry a little

