Build mostly done. Some minor issues with the bottom bracket. The resting stand screws entered the bracket by hundreths of an inch and had to be removed, filed and replaced. The original BB was a bitch to get out and almost stripped out from my tool. The cheater bar bent.
The current battery is a temp one from the Huffy Hauler, a 20Ahr Sunthing. The panniers are Iberia, and the inside one removes quickly to preserve the fold. However, I don't think I'd tour with it. Just not durable enough nor large enough.
The stock Bafang HUD doesn't tell you much beyond odometer and speed, It doesn't even tell you voltage. A CA with shunt will likely be added.
Added a front 160 disc brake. Spyre TRP. Greatly improves stopping distance IMHO. However, the stock breaks were very good to begin with. Maybe this is overkill, but Yan (owner of Downtube) recommended I add it. Waterbottle rack added, but mwkeefer recommended that is where the battery should go, there and maybe on the front brazons.
Oh, I should make a shoutout to mwkeefer, the guru of Downtube conversions, for many hours of advice on this project.
I don't like the cabling along the handlebar tube, but it preserves the fold. Some improvements will be made.
Rear quick release skewer was replaced with one from my bike trailer. The bike trailer is for touring in Texas not international.
View attachment 1