DaS Energy
10 mW
- Joined
- Dec 20, 2010
- Messages
- 23
Posted in Open technology free to copy.
Construction mode is same diameter pipe, two flap valves, two hydro turbine and one tennis ball.
Cool gas is heated in short cylinder.
This provides a downward force on the water causing it to exit through a hydro turbine into a holding tank directly above a second hydro turbine .
After the gas has blown down the short pipe it crosses over into the longer cylinder where the gas rises to the surface displacing water on the way.
This water displacement leaves the float blocking the exhaust hole nothing to float on.
The gas no escapes into the holding tank directly above the second turbine forcing water down through it to refill all cylinder.
The timing pipe has lower end in the short cylinder and higher end in the taller cylinder. The timing pipe blows clear of water at cylinder cross over of gas. Its purpose is to prevent a gas pocket forming in the short cylinder as the the water returns.
The gas now in the holding tank has its expansion removed by incoming water exiting the first turbine receiving water from the blow out of the short cylinder.
The force provided is equal in both turbines however only one heat up is required in place of two.
Construction mode is same diameter pipe, two flap valves, two hydro turbine and one tennis ball.
Cool gas is heated in short cylinder.
This provides a downward force on the water causing it to exit through a hydro turbine into a holding tank directly above a second hydro turbine .
After the gas has blown down the short pipe it crosses over into the longer cylinder where the gas rises to the surface displacing water on the way.
This water displacement leaves the float blocking the exhaust hole nothing to float on.
The gas no escapes into the holding tank directly above the second turbine forcing water down through it to refill all cylinder.
The timing pipe has lower end in the short cylinder and higher end in the taller cylinder. The timing pipe blows clear of water at cylinder cross over of gas. Its purpose is to prevent a gas pocket forming in the short cylinder as the the water returns.
The gas now in the holding tank has its expansion removed by incoming water exiting the first turbine receiving water from the blow out of the short cylinder.
The force provided is equal in both turbines however only one heat up is required in place of two.