methods
1 GW
I will write it up once root cause for the entire system is determined.

This was during a bench test shake down.
Parts pedigree
Procedure and pre-flight checkout
We are working on basic precheck
One test is measuring contactor resistance
The contactor is to be instrumented such that during a run-up the contacts can be read like a shunt. GO or NO GO.
We can do a simple Red Light, Green Light for this. Visual.
It can be as complicated as an interlock... but... keep it simple yes?
The complicated version measures contactor resistance and latches the contactor open
Meh... Visual only.
No electronics which are not needed.
Contactor contacts must be measured under load to present.
-methods

This was during a bench test shake down.
Parts pedigree
Procedure and pre-flight checkout
We are working on basic precheck
One test is measuring contactor resistance
The contactor is to be instrumented such that during a run-up the contacts can be read like a shunt. GO or NO GO.
We can do a simple Red Light, Green Light for this. Visual.
It can be as complicated as an interlock... but... keep it simple yes?
The complicated version measures contactor resistance and latches the contactor open
Meh... Visual only.
No electronics which are not needed.
Contactor contacts must be measured under load to present.
-methods