Hey ES boys n girls, i have been reading like crazy for the past 2 weeks all over this forum.
basically i am in need of transport to n from work 15kms each way ish... i work 5 days a week but need alternative transport 3 days a week at least as my wife needs the car these 3 days to transport our 2 kids n a third to arrive soon. so between that and a mortgage my pay evaporates instantly and my budget is zero...
Therefor "Project ZERO" is born...
I have experience building a few petrol bicycles, plus one was my daily transport 24kms a day to work n back however that was travelling along unsealed quiet roads.. so police were no bother. now i have to travel along all main roads and need silent power, i dont mind pedaling to keep fit as i did with my pertol bike...
I learn quickly when hands on tinkering...
i have some donor parts, pics to follow... any help would be greatly appreciated...
thanks in advance.
basically i am in need of transport to n from work 15kms each way ish... i work 5 days a week but need alternative transport 3 days a week at least as my wife needs the car these 3 days to transport our 2 kids n a third to arrive soon. so between that and a mortgage my pay evaporates instantly and my budget is zero...
Therefor "Project ZERO" is born...
I have experience building a few petrol bicycles, plus one was my daily transport 24kms a day to work n back however that was travelling along unsealed quiet roads.. so police were no bother. now i have to travel along all main roads and need silent power, i dont mind pedaling to keep fit as i did with my pertol bike...
I learn quickly when hands on tinkering...
i have some donor parts, pics to follow... any help would be greatly appreciated...
thanks in advance.