izeman
1 GW
finished the bracket to clamp the battery box to the handle bar.
aluminium bar: 150x70x15mm.
drilled two 26mm holes,
then cut in half,
the put it in the mill to make all surfaces even,
drilled holes for the screws and cut m6 threads.
only problem left was, that handle bars change their diameter from the middle, where they are clamped from 25.4mm (1in) to 22.x at the end where the brake levers are. so clamping was not even. what i did was take some metal repair epoxy, which becomes very hard and can be drilled etc when dried and put it on the inner sides of the clamps. then attached the clamps to the handle bar and squeezed the epoxy out. let it dry, and i have a perfect fit over the whole width of the clamps.
aluminium bar: 150x70x15mm.
drilled two 26mm holes,

then cut in half,

the put it in the mill to make all surfaces even,

drilled holes for the screws and cut m6 threads.
only problem left was, that handle bars change their diameter from the middle, where they are clamped from 25.4mm (1in) to 22.x at the end where the brake levers are. so clamping was not even. what i did was take some metal repair epoxy, which becomes very hard and can be drilled etc when dried and put it on the inner sides of the clamps. then attached the clamps to the handle bar and squeezed the epoxy out. let it dry, and i have a perfect fit over the whole width of the clamps.
