No heatsink. Good idea though. I'll figure that out when I swap out the battery?
I just need to find the time to build it (I have all the pieces).
I did setup a conservative field weakening configuration that is working well.
I got my top speed back up to 32 max MPH.
This is what I did:
Increased Duty Cycle Limit to 90% (up from 85%).
Field Weakening Maximum Current 15A
Field Weakening Duty Cycle 80%...kicks in around 24MPH.
Field Weakening Ramp Time 600ms.
Observed watts on Vesc Tool is around 1500w cruising between 28 and 31 MPH.
I just need to find the time to build it (I have all the pieces).
I did setup a conservative field weakening configuration that is working well.
I got my top speed back up to 32 max MPH.
This is what I did:
Increased Duty Cycle Limit to 90% (up from 85%).
Field Weakening Maximum Current 15A
Field Weakening Duty Cycle 80%...kicks in around 24MPH.
Field Weakening Ramp Time 600ms.
Observed watts on Vesc Tool is around 1500w cruising between 28 and 31 MPH.